Ruud Air Handler
Quiz Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 10
1. Question
When converting to horizontal right, the shorter rail goes on the ________ of the cabinet
CorrectIncorrect -
Question 2 of 10
2. Question
Control wire longer than 100 feet needs to be what size?
CorrectIncorrect -
Question 3 of 10
3. Question
The txv sensing bulb should be mounted on a horizontal section at the 10 o’clock or 2 o’clock position.
CorrectIncorrect -
Question 4 of 10
4. Question
The reversing valve (B) is energized in cooling mode?
CorrectIncorrect -
Question 5 of 10
5. Question
The CFM LED will flash 1 second for every _______ CFM
CorrectIncorrect -
Question 6 of 10
6. Question
What is the maximum PSI for leak testing with dry nitrogen?
CorrectIncorrect -
Question 7 of 10
7. Question
The approximate time delay on the electric heater sequencers is how long?
CorrectIncorrect -
Question 8 of 10
8. Question
A 3 inch trap should be installed as close to the unit as possible.
CorrectIncorrect -
Question 9 of 10
9. Question
A RH1T air handler with a call for cooling (Y1) present, the blower control will send 24VAC to the constant torque blower via what terminal?
CorrectIncorrect -
Question 10 of 10
10. Question
What is the max external static pressure in inches water column as specified on the blower performance chart for the RH1T air handler?
CorrectIncorrect